The metal sewage treatment center in the Lnjinwan environmental industrial park on Taiye Road in Xiaolan Town was topped out on August 8. This high-end environmental facility will be accessible to all the metal surface treatment enterprises in the park.
With a floor area of 19,000 square meters, the center can treat 10,000 m3 of wastewater per day. Upon completion, it will make sewage traceable, sewage treatment controllable and sewage discharge up to standards. Besides, a digital dark factory will emerge with leading industrial technologies.
The Lvjinwan industrial park is about to go into production. "Phase One is expected to be completed by the end of the year, and will go into trial operation in the near future." Said the project developer, adding that a number of metal surface treatment enterprises from Zhongshan, Shenzhen and Jiangmen have signed to move in the park.
The park is also equipped with an intensive centralized treatment system for wastewater, waste gas and hazardous solid waste, in addition to a comprehensive energy system, a vertical logistics transportation system, a 5G intelligent management system, employee apartments, canteens and other supporting facilities.