The second batch of 5 key projects of the Yuxiang Industrial Park in Henglan Town started construction on November 1. These projects cover a total area of about 111 mu, with a planned investment of about 1.13 billion yuan.
These projects, including Done's high-power LED drive and power supply production base, the industry-university-research base for electronic oven and heat source, the Lizhuo Power Production Base, the intelligent R&D and production base for high-precision auto parts, and the Baolan Metal Products Production Base, are expected to generate an annual output value of 1.82 billion yuan at full capacity.