Due to the tunnel construction on the Guangzhou-Zhuhai West Expressway, traffic control will be implemented on the sections from Zhongshan South Toll Station to Sanxiang Toll Station.
The section from Sanxiang to Zhongshan South in the direction of Guangzhou will be closed for 25 days from October 23 to November 16, with a control period of eight hours a day (22:00 to 06:00 the next day).
The section from Zhongshan South to Sanxiang in the direction of Zhuhai will be closed for 25 days from November 17 to December 11, with a control period of eight hours a day (22:00 to 06:00 the next day).
During the closure of the main line in the direction of Guangzhou, the ramp entrances from Sanxiang Toll Station and Banfu Toll Station will be closed. During the closure of the main line in the direction of Zhuhai, the ramp entrances from Zhongshan South Toll Station and Banfu Toll Station will be closed.
The traffic police department reminds drivers to pay attention to navigation software's instructions, check real-time road conditions, and plan the route in advance.