Page Options
>> >>view
Main line of NanZhong Expressway Zhongshan section connected
2024-10-29

The main line of the Nansha-Zhongshan Expressway (NanZhong Expressway) Zhongshan section has been connected, with the remaining ancillary works currently under construction. It is nearing completion and will soon be open to traffic.


1029-1.jpg


With an investment of over 20 billion yuan, the 32.41-kilometer NanZhong Expressway consists of the main line and the Wanqingsha branch line. The main line starts from the Xinken interchange with Nansha Port Expressway and ends at the Xinlong interchange. The Wanqingsha branch line starts from the Xinken interchange, and connects to the ShenZhong Link through the Wanqingsha interchange.


The main line and the Wanqingsha branch line will open to traffic simultaneously. By then, the driving time between downtown Zhongshan and the Nansha Port will be only 25 minutes.


NanZhong Expressway has six toll stations in total, three of which are in Zhongshan, namely Shenzhen-Zhongshan Cooperation Zone, Minzhong South and Qijiang New Town North.


On October 22, the Department of Transport of Guangdong Province announced the toll standard for NanZhong Expressway. For example, the toll will be 24 yuan from Minzhong South to Nansha South (37 kilometers), and 73 yuan from Minzhong South to Xixiang North in Shenzhen's Qianhai (47 kilometers).

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us