Page Options
>> >>view
Progress made in construction of ShenJiang Railway
2025-01-14

The first steel girder of the Jiya Waterway Grand Bridge on the ShenJiang (Shenzhen-Jiangmen) Railway was erected on January 11, marking the start of the superstructure construction.


0114-5.jpg


As a key engineering project of the ShenJiang Railway, Jiya Waterway Grand Bridge spans 6.8 kilometers, with a main span of 408 meters. It is a steel-concrete composite girder cable-stayed bridge.


The bridge has 31 steel girders, which will cost 5,189 tons of steel. The first steel girder is 12.5 meters long, 17 meters wide and 4 meters high, and weighs 224.9 tons.


The 116.12-kilometer ShenJiang Railway, with a design speed of 250 kmph, is a major transportation infrastructure that serves the Belt and Road Initiative and the construction of the Guangdong-Hong Kong-Macao Greater Bay Area and the China (Guangdong) Pilot Free Trade Zone.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us