Page Options
>> >>view
'Rainbow' over Qijiang River
2022-10-10

1010-3.jpg


The main steel structure of the Qijiang River Bridge was completed on October 4. Thereafter, ancillary facilities will be installed on the bridge deck.


The Qijiang River Bridge is expected to be complete by November 30 according to the current project schedule. It will connect Chengnan Road to the Cuijing Avenue section of South Outer Ring Road, easing traffic congestion on both sides of the Qijiang River and relieve traffic on Bo'ai Road.


1010-4.jpg


The Bridge is about 1,340 meters long and the main bridge is 153 meters long. It is the first double-deck bridge in Zhongshan. The lower section of is part of the South Outer Ring Road, and the upper section is part of the Zhongshan-Kaiping Expressway.


Looking down from high above, the Qijiang River Bridge looks like "a huge rainbow spreading across the Qijiang River".

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us