Page Options
>> >>view
Pipe section E22 installed on Shenzhen-Zhongshan Bridge tunnel
2022-10-25

1025-4.jpg


On October 21, Guangdong Provincial Communication Group announced the successful installation of pipe section E22 on the underwater tunnel section of the Shenzhen-Zhongshan Bridge.


E22 is a standard pipe section with a length of 165 meters. Its smooth installation will be a precondition of the closure of the tunnel.


A total of 31 pipe sections, including E1-E22 on the west side and E24-E32 on the east side, have been installed, with a total length of 4,867.8 meters. A new world record was set regarding the speed and accuracy of the transportation and installation of the pipes.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us