Page Options
>> >>view
Subsea tunnel of Shenzhen-Zhongshan Bridge connected
2023-06-13

0613-2.jpg


The Fanshi waterway near Shenzhen Airport was calm on June 11. At a depth of 24 meters, the final joint of the subsea tunnel of the Shenzhen-Zhongshan Bridge, or the ShenZhong Link, was precisely connected to the E24 tube segment, marking the closure of the world's longest and widest steel-shell immersed tube tunnel.


As a key component of the subsea tunnel, the final joint, 5.1 meters in length, 46 meters in width, 9.75 meters in height and about 1,600 tons in weight, was placed in the expanded section of the E23 tube segment.


Via the "undersea great wall" built over a period of five years, Shenzhen and Zhongshan join hands under the sea in the Lingdingyang waters.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us