The new Zhongshan Passenger Port is basically completed, and the construction has entered the final part.
The new passenger port, adjacent to the landing point of the ShenZhong Link, is a first-class national port with a building area of approximately 63,000 square meters. The 4-storey joint inspection building has an underground floor area of 34,000 square meters, with 703 parking spots.
The new passenger port will open three routes to downtown Hong Kong, Hong Kong International Airport and Macao respectively, which will reduce the journey time by 20 minutes compared with the old port.
In the future, more routes will be opened for island tour and sightseeing.